4675 Via Amante, Yorba Linda, California

THE FOUNDATION AND FOOTINGS ARE POURED

After the contractor has placed the moment frames into the footing cavities, the pad footings are then poured first and allowed to cure before pouring the remaining footings and the slab. The grade beam or steel cages that I spoke of in my previous post are what tie the steel columns together creating a structural moment frame.

Steel Beam and Footing

The Concrete Pumper

The Concrete Pumper

4675 Via Amante, Yorba Linda, CA

4675 Via Amante, Yorba Linda, CA

4675 Via Amante, Yorba Linda, CA

4675 Via Amante, Yorba Linda, CA

4675 Via Amante, Yorba Linda, CA.

4675 Via Amante, Yorba Linda, CA.

The Finished Slab

Concrete Steps

 If I can answer any questions about  how to obtain a building permit, or the process of building a new home or remodeling an existing home, please feel free to contact me at 949-723-4393 or email me.